WelcomeUser Guide
ToSPrivacyCanary
DonateBugsLicense

©2025 Poal.co

541

So last week I finished this office remodel, check it out

Area 1 we strat by taking down the old ceiling and insulation http://picinfinity.co/d/1686e9a5-0719-4241-809c-096f7f3737f6.jpg

Area 2 http://picinfinity.co/d/856319a9-2d6c-4899-8ae2-d4dc9a32b9d4.jpg

Hallway that connects the two areas http://picinfinity.co/d/17736619-5871-4341-a873-3186221bc71b.jpg

Pulled up the carpet http://picinfinity.co/d/b8d91058-a53e-4f59-9ce9-2880d2645baa.jpg

And popped up the tile http://picinfinity.co/d/74817fa2-be46-4499-92ed-07ccd2483c01.jpg

Progress http://picinfinity.co/d/fa2792a5-ccda-4369-a147-494710ea33ae.jpg

Demo some existing offices http://picinfinity.co/d/f1cb6c6b-ee6f-472e-969f-4a7088d8e3af.jpg

More http://picinfinity.co/d/1f8124a8-ed92-42c5-9fba-1c25283c9321.jpg

Getting the carpet glue up with a giant grinder http://picinfinity.co/d/9a3dc6aa-00f6-4de4-ad6e-bb96b746a539.jpg

Lots of glue http://picinfinity.co/d/f9da04a3-9d18-4cb4-8a4c-4bba4a0f4892.jpg

Cleaned up and ready for the next step http://picinfinity.co/d/909efd18-f09e-4aa5-84b4-66f696bb4ee2.jpg

Framing http://picinfinity.co/d/2c2b35cb-c1b7-4737-83d1-25e88fa72c83.jpg

http://picinfinity.co/d/f9bc8f92-2f4b-48b4-aef6-97e837a4bd26.jpg

http://picinfinity.co/d/bb8bb137-16d8-414d-a437-1c46b295788c.jpg

http://picinfinity.co/d/0f98d0d5-42c0-4e46-ab56-bee6e8e47155.jpg

Getting the Sheetrock up http://picinfinity.co/d/c15e80d7-e31e-49ab-958f-c9f23ea1d767.jpg

http://picinfinity.co/d/1d108442-e95b-4a78-9b9a-1ed785aab2c7.jpg

Wall Texture http://picinfinity.co/d/cdfbda91-2195-4173-b02c-39bed2335ef9.jpg

Insulation guys did their thing http://picinfinity.co/d/8309e63b-d205-44cc-afe7-7dede5c585f7.jpg

http://picinfinity.co/d/c61f0bee-5b4f-4013-8d31-4fc958a5d2bf.jpg

Tile time http://picinfinity.co/d/532d1aaf-019a-4e91-a7c6-a689784777eb.jpg

I really like the wood plank tile http://picinfinity.co/d/122f61d9-3b9e-4242-aee4-66e0f5aba772.jpg

Getting some paint on the walls http://picinfinity.co/d/4790955b-93f4-4252-96bd-a748c75139ff.jpg

New ceiling grid going up http://picinfinity.co/d/7208ebb7-4793-4255-82d7-7bfd72f70aa5.jpg

New lights and HVAC system http://picinfinity.co/d/135a0cfd-cc76-456c-80bb-b9ae4cc55056.jpg

Doors set, running trim, new pugs and switches http://picinfinity.co/d/6d525da4-c50a-4fb3-b2c1-1c830a4e53f8.jpg

Finished product http://picinfinity.co/d/7cc726ce-7fc7-4952-beb3-29cbaa0dffa7.jpg

http://picinfinity.co/d/15edcb69-5d0c-4f8b-b77e-03b8e71d7ae5.jpg

There were a total of 18 offices and over 3000sqft of tile.

The End

So last week I finished this office remodel, check it out Area 1 we strat by taking down the old ceiling and insulation http://picinfinity.co/d/1686e9a5-0719-4241-809c-096f7f3737f6.jpg Area 2 http://picinfinity.co/d/856319a9-2d6c-4899-8ae2-d4dc9a32b9d4.jpg Hallway that connects the two areas http://picinfinity.co/d/17736619-5871-4341-a873-3186221bc71b.jpg Pulled up the carpet http://picinfinity.co/d/b8d91058-a53e-4f59-9ce9-2880d2645baa.jpg And popped up the tile http://picinfinity.co/d/74817fa2-be46-4499-92ed-07ccd2483c01.jpg Progress http://picinfinity.co/d/fa2792a5-ccda-4369-a147-494710ea33ae.jpg Demo some existing offices http://picinfinity.co/d/f1cb6c6b-ee6f-472e-969f-4a7088d8e3af.jpg More http://picinfinity.co/d/1f8124a8-ed92-42c5-9fba-1c25283c9321.jpg Getting the carpet glue up with a giant grinder http://picinfinity.co/d/9a3dc6aa-00f6-4de4-ad6e-bb96b746a539.jpg Lots of glue http://picinfinity.co/d/f9da04a3-9d18-4cb4-8a4c-4bba4a0f4892.jpg Cleaned up and ready for the next step http://picinfinity.co/d/909efd18-f09e-4aa5-84b4-66f696bb4ee2.jpg Framing http://picinfinity.co/d/2c2b35cb-c1b7-4737-83d1-25e88fa72c83.jpg http://picinfinity.co/d/f9bc8f92-2f4b-48b4-aef6-97e837a4bd26.jpg http://picinfinity.co/d/bb8bb137-16d8-414d-a437-1c46b295788c.jpg http://picinfinity.co/d/0f98d0d5-42c0-4e46-ab56-bee6e8e47155.jpg Getting the Sheetrock up http://picinfinity.co/d/c15e80d7-e31e-49ab-958f-c9f23ea1d767.jpg http://picinfinity.co/d/1d108442-e95b-4a78-9b9a-1ed785aab2c7.jpg Wall Texture http://picinfinity.co/d/cdfbda91-2195-4173-b02c-39bed2335ef9.jpg Insulation guys did their thing http://picinfinity.co/d/8309e63b-d205-44cc-afe7-7dede5c585f7.jpg http://picinfinity.co/d/c61f0bee-5b4f-4013-8d31-4fc958a5d2bf.jpg Tile time http://picinfinity.co/d/532d1aaf-019a-4e91-a7c6-a689784777eb.jpg I really like the wood plank tile http://picinfinity.co/d/122f61d9-3b9e-4242-aee4-66e0f5aba772.jpg Getting some paint on the walls http://picinfinity.co/d/4790955b-93f4-4252-96bd-a748c75139ff.jpg New ceiling grid going up http://picinfinity.co/d/7208ebb7-4793-4255-82d7-7bfd72f70aa5.jpg New lights and HVAC system http://picinfinity.co/d/135a0cfd-cc76-456c-80bb-b9ae4cc55056.jpg Doors set, running trim, new pugs and switches http://picinfinity.co/d/6d525da4-c50a-4fb3-b2c1-1c830a4e53f8.jpg Finished product http://picinfinity.co/d/7cc726ce-7fc7-4952-beb3-29cbaa0dffa7.jpg http://picinfinity.co/d/15edcb69-5d0c-4f8b-b77e-03b8e71d7ae5.jpg There were a total of 18 offices and over 3000sqft of tile. The End

(post is archived)

[–] 0 pt

So how long did it take to get that glue off?

[–] 1 pt

4 days. It was a bitch. Pulling the carpet was awful, that shit was stuck like chuck.

Job took 8 weeks working 10 to 14 hrs a day. I'm glad it's over